{"id":1668,"date":"2016-10-27T11:32:46","date_gmt":"2016-10-27T09:32:46","guid":{"rendered":"http:\/\/www.rubau.com\/?p=1668"},"modified":"2025-07-24T16:22:23","modified_gmt":"2025-07-24T14:22:23","slug":"successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed","status":"publish","type":"post","link":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/","title":{"rendered":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE"},"content":{"rendered":"<p>La Dorada (Caldas), 20 October 2016 \u2013 The first test run was successfully completed along the 767 km of the Chiriguan\u00e1-La Dorada railway line by a train pulling a 360-tonne cargo of containers.<\/p>\n<p>The test run, which took 4 days to complete, was greeted with great excitement by the inhabitants of the towns along the route which traverses the departments of Magdalena, Cesar, Santander, Antioquia and Caldas. Luis Fernando Andrade, President of the National Infrastructure Agency (ANI), affirmed that \u2018the train achieved its objective of testing the condition of the line with a view to future freight and passenger operations, in particular on the section between Chiriguan\u00e1 and La Dorada, where the National Government, through the ANI, has invested in the rehabilitation of the line, and where no loaded train had been able to pass for more than16 years\u2019.<\/p>\n<p>The contract for the rehabilitation work on the line between Chiriguan\u00e1 and La Dorada was awarded to the Temporary Central Railway Union, of which RUBAU is a member, at the end of 2013. Today, as a result of the work undertaken, the revival of Colombia\u2019s railway network is becoming an ever-greater reality for an ever-larger part of the country\u2019s population.<\/p>\n<p>The following link will take you to a video of the train during the test run on the stretch of line between Puerto de Santa Mar\u00eda and La Dorada.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Dorada (Caldas), 20 October 2016 \u2013 The first test run was successfully completed along the 767 km of the Chiriguan\u00e1-La Dorada railway line by a train pulling a 360-tonne cargo of containers. The test run, which took 4 days to complete, was greeted with great excitement by the inhabitants of the towns along the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1663,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[26,16],"class_list":["post-1668","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-chiriguana-to-la-dorada-railway-line","tag-construcciones-rubau-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau\" \/>\n<meta property=\"og:description\" content=\"La Dorada (Caldas), 20 October 2016 \u2013 The first test run was successfully completed along the 767 km of the Chiriguan\u00e1-La Dorada railway line by a train pulling a 360-tonne cargo of containers. The test run, which took 4 days to complete, was greeted with great excitement by the inhabitants of the towns along the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/\" \/>\n<meta property=\"og:site_name\" content=\"Rubau\" \/>\n<meta property=\"article:published_time\" content=\"2016-10-27T09:32:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-24T14:22:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE\",\"datePublished\":\"2016-10-27T09:32:46+00:00\",\"dateModified\":\"2025-07-24T14:22:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/\"},\"wordCount\":240,\"publisher\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/tren-prueba.jpg\",\"keywords\":[\"CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE\",\"CONSTRUCCIONES RUBAU\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/\",\"name\":\"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/tren-prueba.jpg\",\"datePublished\":\"2016-10-27T09:32:46+00:00\",\"dateModified\":\"2025-07-24T14:22:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/tren-prueba.jpg\",\"contentUrl\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/tren-prueba.jpg\",\"width\":600,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.rubau.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#website\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/\",\"name\":\"Rubau\",\"description\":\"Construccions RUBAU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.rubau.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#organization\",\"name\":\"Rubau\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Logo-CONSTRUCCIONS-RUBAU-ES1.png\",\"contentUrl\":\"https:\\\/\\\/www.rubau.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Logo-CONSTRUCCIONS-RUBAU-ES1.png\",\"width\":1010,\"height\":200,\"caption\":\"Rubau\"},\"image\":{\"@id\":\"https:\\\/\\\/www.rubau.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/construcciones_rubau\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/construcciones-rubau-s.a.\"]},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\\\/\\\/www.rubau.com\\\/en\\\/author\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/","og_locale":"en_US","og_type":"article","og_title":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau","og_description":"La Dorada (Caldas), 20 October 2016 \u2013 The first test run was successfully completed along the 767 km of the Chiriguan\u00e1-La Dorada railway line by a train pulling a 360-tonne cargo of containers. The test run, which took 4 days to complete, was greeted with great excitement by the inhabitants of the towns along the [&hellip;]","og_url":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/","og_site_name":"Rubau","article_published_time":"2016-10-27T09:32:46+00:00","article_modified_time":"2025-07-24T14:22:23+00:00","og_image":[{"width":600,"height":300,"url":"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#article","isPartOf":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/"},"author":{"name":"","@id":""},"headline":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE","datePublished":"2016-10-27T09:32:46+00:00","dateModified":"2025-07-24T14:22:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/"},"wordCount":240,"publisher":{"@id":"https:\/\/www.rubau.com\/#organization"},"image":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg","keywords":["CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE","CONSTRUCCIONES RUBAU"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/","url":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/","name":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE - Rubau","isPartOf":{"@id":"https:\/\/www.rubau.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#primaryimage"},"image":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg","datePublished":"2016-10-27T09:32:46+00:00","dateModified":"2025-07-24T14:22:23+00:00","breadcrumb":{"@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#primaryimage","url":"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg","contentUrl":"https:\/\/www.rubau.com\/wp-content\/uploads\/2016\/10\/tren-prueba.jpg","width":600,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.rubau.com\/en\/successful-test-run-carried-out-on-colombias-chiriguana-to-la-dorada-railway-line__trashed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.rubau.com\/"},{"@type":"ListItem","position":2,"name":"SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA\u2019S CHIRIGUAN\u00c1 TO LA DORADA RAILWAY LINE"}]},{"@type":"WebSite","@id":"https:\/\/www.rubau.com\/#website","url":"https:\/\/www.rubau.com\/","name":"Rubau","description":"Construccions RUBAU","publisher":{"@id":"https:\/\/www.rubau.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rubau.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rubau.com\/#organization","name":"Rubau","url":"https:\/\/www.rubau.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rubau.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.rubau.com\/wp-content\/uploads\/2024\/10\/Logo-CONSTRUCCIONS-RUBAU-ES1.png","contentUrl":"https:\/\/www.rubau.com\/wp-content\/uploads\/2024\/10\/Logo-CONSTRUCCIONS-RUBAU-ES1.png","width":1010,"height":200,"caption":"Rubau"},"image":{"@id":"https:\/\/www.rubau.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/construcciones_rubau\/","https:\/\/www.linkedin.com\/company\/construcciones-rubau-s.a."]},{"@type":"Person","@id":"","url":"https:\/\/www.rubau.com\/en\/author\/"}]}},"_links":{"self":[{"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/posts\/1668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/comments?post=1668"}],"version-history":[{"count":0,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/posts\/1668\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/media\/1663"}],"wp:attachment":[{"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/media?parent=1668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/categories?post=1668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rubau.com\/en\/wp-json\/wp\/v2\/tags?post=1668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}