INCASÒL awards Rubau the first phase of a project to build 102 housing units in Trinitat Nova, Barcelona

September, 2013

INCASÒL has awarded Rubau the first phase of a project to build 103 housing units, commercial premises and flats. This phase corresponds to the construction of staircase A with 13 housing units between the streets Palamós and Aiguablava in the Trinitat Nova neighbourhood.

The building is adapted to the plots almost 6-metre upward slope in an east-west direction. Entrances are on the northern facade through an open space surrounding the building, which guarantees access using a series of ramps and paved areas connecting Palamós and Aiguablava streets.

The 13 dwellings will consist of seven dwellings with three bedrooms and six dwellings with four bedrooms. The result is a combination of styles which meets the needs of those to be housed there, who represent ever more diverse family units, and the demands of the functional programme.

The exhaust areas of the building have be grouped together as much as possible into vertical shafts, so that kitchen as well as mechanical ventilation takes up as little space as possible, with only one flue per housing unit. The flue is not in contact with any of the bedroom walls nor is any bedroom next to the wall of the lift shaft, in order to avoid bothersome noises. The kitchens are separate but with the option of creating a double access, entering from both the hall and the living room.

In general, this is a construction project which, considering its surroundings, is characterised by its sustainability, responding to the needs of the people of Trinitat Nova.

News

RUBAU AWARDED A RAILWAY CONTRACT IN MEXICO WORTH MORE THAN €170 MILLION

The project includes the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, a strategic infrastructure project aimed at enhancing rail mobility in northern Mexico. Rubau has been awarded the contract for the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, one of the flagship projects […]

+ read more

AREMA COMPLETES WATER SUPPLY REINFORCEMENT WORKS IN PERALADA (GIRONA)

La actuación, promovida por la Agència Catalana de l’Aigua (ACA), mejora la garantía de suministro de las tres redes de distribución que dependen de los pozos del entorno de Peralada. The project, promoted by the Catalan Water Agency (ACA), strengthens the reliability of the three water distribution networks supplied by the wells located around Peralada. […]

+ read more

RUBAU COMPLETES THE CONSTRUCTION OF THE MANHATTAN RESIDENTIAL DEVELOPMENT IN ENSANCHE DE VALLECAS (MADRID)

RUBAU has completed the construction of Manhattan Residential, a development of 66 homes located in Ensanche de Vallecas (Madrid), built for the client PREMIER ESPAÑA S.A.U. The project, carried out between June 2024 and January 2026, comprises two-, three- and four-bedroom apartments with storage rooms and parking spaces, integrated into a private residential complex designed […]

+ read more

LLOGUERALIA COMPLETES THE CONSTRUCTION OF 110 AFFORDABLE RENTAL HOMES IN CALAFELL

Llogueralia has completed the construction of 110 affordable rental homes in Calafell, a key project aimed at expanding the supply of accessible housing in the municipality and responding to local residential demand. Located in the Sant Andreu neighbourhood of Calafell and promoted in collaboration with Calafell Town Council, this development has involved an investment of […]

+ read more
All News