SUCCESSFUL TEST RUN CARRIED OUT ON COLOMBIA’S CHIRIGUANÁ TO LA DORADA RAILWAY LINE

October, 2016

La Dorada (Caldas), 20 October 2016 – The first test run was successfully completed along the 767 km of the Chiriguaná-La Dorada railway line by a train pulling a 360-tonne cargo of containers.

The test run, which took 4 days to complete, was greeted with great excitement by the inhabitants of the towns along the route which traverses the departments of Magdalena, Cesar, Santander, Antioquia and Caldas. Luis Fernando Andrade, President of the National Infrastructure Agency (ANI), affirmed that ‘the train achieved its objective of testing the condition of the line with a view to future freight and passenger operations, in particular on the section between Chiriguaná and La Dorada, where the National Government, through the ANI, has invested in the rehabilitation of the line, and where no loaded train had been able to pass for more than16 years’.

The contract for the rehabilitation work on the line between Chiriguaná and La Dorada was awarded to the Temporary Central Railway Union, of which RUBAU is a member, at the end of 2013. Today, as a result of the work undertaken, the revival of Colombia’s railway network is becoming an ever-greater reality for an ever-larger part of the country’s population.

The following link will take you to a video of the train during the test run on the stretch of line between Puerto de Santa María and La Dorada.

News

RUBAU COMPLETES INFRASTRUCTURE WORKS AT THE LA LLAGOSTA INTERMODAL TERMINAL (BARCELONA)

Rubau has completed the construction works for the infrastructure and equipment required for the operation of the La Llagosta Multimodal Platform in Barcelona. The project provides the terminal with new access points, operational areas, and control, security and telecommunications systems. The works included the reorganisation and improvement of access to the terminal, the installation of […]

+ read more

RUBAU COMPLETES THE URBAN INTEGRATION WORKS ON THE N-502A IN TALAVERA DE LA REINA

Rubau has completed the urban integration works on the N-502A road as it passes through Talavera de la Reina (Toledo), a project promoted by the Ministry of Transport and Sustainable Mobility that has transformed 4.5 kilometres of the former road through the town and improved its integration into the urban environment. The project, with an […]

+ read more

RUBAU AWARDED A RAILWAY CONTRACT IN MEXICO WORTH MORE THAN €170 MILLION

The project includes the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, a strategic infrastructure project aimed at enhancing rail mobility in northern Mexico. Rubau has been awarded the contract for the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, one of the flagship projects […]

+ read more

AREMA COMPLETES WATER SUPPLY REINFORCEMENT WORKS IN PERALADA (GIRONA)

La actuación, promovida por la Agència Catalana de l’Aigua (ACA), mejora la garantía de suministro de las tres redes de distribución que dependen de los pozos del entorno de Peralada. The project, promoted by the Catalan Water Agency (ACA), strengthens the reliability of the three water distribution networks supplied by the wells located around Peralada. […]

+ read more
All News