2024080 Residencial KentiaI | Construccions Rubau | Manolo Espaliú – Fotografía de Arquitectura
RUBAU has completed the construction of a residential complex consisting of 96 homes for Vía Célere in the town of Dos Hermanas, Seville. The development offers 96 homes with 2, 3, and 4 bedrooms, distributed across two buildings with a total of four entrances. It also includes 109 parking spaces and 96 storage units. The development is located in a unique setting near the “El Pensador” roundabout in Entrenúcleos, a peaceful area just 15 minutes from the center of the Andalusian capital.
Energy Efficiency and Communal Areas
The Célere Kentia residential complex features a solar thermal installation for hot water with solar panels on the roof. The installed collector surface achieves a coverage of over 80%, exceeding the 70% minimum solar contribution required by the Technical Building Code (CTE) for the municipality of Dos Hermanas. Additionally, each home is equipped with an individual electric water heater system to always ensure a continuous supply of hot water.
This development stands out for its communal areas, which include a swimming pool, children’s playground, fully equipped gym, and a social-gourmet room with a children’s area. It offers a unique and high-quality experience, allowing residents to enjoy tranquility in an urban environment.
With the inauguration of this Vía Célere development, RUBAU reinforces its reputation for quality and excellence in construction processes.
Here is a video with a photo gallery:
News
Rubau has completed the construction works of the Célere Acacia development, a residential complex comprising 102 homes located in Dos Hermanas (Seville), developed for Vía Célere. The project involved the construction of a residential building offering 2, 3 and 4-bedroom homes, as well as parking spaces and storage units, resulting in a modern and functional […]
AREMA (Rubau Group) has completed the refurbishment works of the Sant Gregori Wastewater Treatment Plant (WWTP), a project promoted by the Catalan Water Agency that represents a significant improvement in the capacity and efficiency of water treatment in the municipality. The new facility responds to the growth experienced in recent years, increasing its capacity from an […]
Rubau, in a joint venture with Grulop 21, has signed the contract for the construction of the new Biosanitary Campus of the University of Castilla-La Mancha (UCLM) in Ciudad Real, a strategic project in the academic and healthcare sector with an investment of over €38 million and a 30-month execution period. The future complex will […]
Rubau México has been awarded the contract for the construction of the Maravatío Bypass in the State of Michoacán, for a total amount of 785.2 million Mexican pesos (€38.5 million), VAT included. The project, promoted by Red de Carreteras de Occidente (Abertis Group), will be carried out in the municipality of Maravatío and has an […]