COMPLETION OF THE REINFORCMENT WORK ON THE SANT FELIU DE GUÍXOLS HARBOUR WALL

July, 2016

Last Friday the completion ceremony took place for the reinforcement work on the Sant Feliu de Guíxols harbour wall. This contract was awarded to the RUBAU – AMSA joint venture in February of this year.

The project, which arose from the need to reduce the overflow experienced by the harbour wall of the port of Sant Feliu de Guíxols, has consisted in the construction of blocks of concrete, weighing 26 tonnes each, to protect the area and prevent the waves from breaking over the wall and the consequent need for the yacht club to move their boats in the case of easterly gales. The opportunity has also been taken to reinforce the surfaces of the walkway and vehicle access roads and to install more efficient replacement street lighting.

See the results of the project in the video

News

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE RENOVATION OF THE WWPS AND EXTENSION OF THE WWTP IN ROSES

Last July, the Consorci de la Costa Brava awarded the AREMA – RUBAU joint venture the contract for the renovation of the central pumping station (WWPS) and the extension of the pre-treatment of the wastewater treatment plant (WWTP) in Roses.   The purpose of the contract is to modify the central WWPS by getting rid of […]

+ read more

RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network. It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective […]

+ read more

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR

Last June, Ens d’Abastament d’Aigües Ter-Llobregat (ATL) awarded the AREMA – RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.  The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that […]

+ read more
La Roca Village. RUBAU

RUBAU COMPLETES THE CONSTRUCTION OF THE UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”

RUBAU has completed the construction of the new UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”, a sustainable and environmentally friendly project during its design and construction.  La Roca Village is the largest outlet-style shopping destination in southern Europe and it is located in La Roca del Vallès. With the aim of improving […]

+ read more
All News