RUBAU Group has initiated the construction works of Phase 1 of the real estate project by Premier España: Central Park Llevant. This involves the construction of a multi-family building consisting of 100 homes, including exclusive penthouses with large solariums, apartments with spacious balconies, and homes with terraces at the communal area level. The residential complex features storage rooms, parking spaces, and a large communal area with green spaces and a swimming pool. The Central Park Llevant development is located in the heart of the Llevant Sector, Viladecans’ new residential area, very close to the city center.
With this new award, Premier España reaffirms its confidence in our company for the construction of its real estate developments, prioritizing the quality and rigor in the construction processes that GRUPO RUBAU offers.
News
Rubau has completed the construction works for the infrastructure and equipment required for the operation of the La Llagosta Multimodal Platform in Barcelona. The project provides the terminal with new access points, operational areas, and control, security and telecommunications systems. The works included the reorganisation and improvement of access to the terminal, the installation of […]
Rubau has completed the urban integration works on the N-502A road as it passes through Talavera de la Reina (Toledo), a project promoted by the Ministry of Transport and Sustainable Mobility that has transformed 4.5 kilometres of the former road through the town and improved its integration into the urban environment. The project, with an […]
The project includes the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, a strategic infrastructure project aimed at enhancing rail mobility in northern Mexico. Rubau has been awarded the contract for the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, one of the flagship projects […]
La actuación, promovida por la Agència Catalana de l’Aigua (ACA), mejora la garantía de suministro de las tres redes de distribución que dependen de los pozos del entorno de Peralada. The project, promoted by the Catalan Water Agency (ACA), strengthens the reliability of the three water distribution networks supplied by the wells located around Peralada. […]