RUBAU_METRO MADRID RUBAU_METRO MADRID

RUBAU INCREASES ITS PRESENCE IN MADRID’S METRO INFRAESTRUCTURE

January, 2018

Last 2017 RUBAU GROUP notably increased its presence in the works that were launched by Metro Madrid in some of its lines. In total 5 million euros has been awarded to RUBAU.

Currently, RUBAU is involved in maintenance works of station for lines 4, 7 and 9. As well as this, it is remodelling the platform of San Blas station and adapting some areas of the Ventas warehouse. In addition, in 2017 RUBAU was awarded various contracts for the implementation and improvement of the accessibility in Principe Pío and Plaza Castilla stations. Finally, in September the installation works of tactovisual ceramic pavement were finished in platforms of various lines.

With the participation in the subway’s investment plan, RUBAU has contributed to ensure safety and comfort of a network which is part of Madrilian’s every day life.

News

RUBAU COMPLETES CONSTRUCTION OF 96 HOMES FOR VÍA CÉLERE IN DOS HERMANAS

An exclusive residential complex that combines innovation, energy savings, and communal facilities, offering the opportunity to enjoy leisure and sports in a peaceful yet urban environment. RUBAU has completed the construction of a residential complex consisting of 96 homes for Vía Célere in the town of Dos Hermanas, Seville. The development offers 96 homes with […]

+ read more

RUBAU IS AWARDED THE RENOVATION WORKS FOR THE BORDILS-JUIÀ STATION (GIRONA)

ADIF has entrusted RUBAU with the renovation works of the Bordils-Juià station in the province of Girona, with a budget of 4.5 million euros and a completion period of 15 months. The work consists of constructing an underpass to connect the platforms, replacing the current level crossing of the tracks, which is currently the only […]

+ read more

CONTRACTA WINS A MAJOR REHABILITATION PROJECT IN BADALONA

CONTRACTA, the company of Grupo RUBAU specialized in complex building works with pathologies and/or structural problems, will carry out the rehabilitation of part of the La Quinta Elvira residential complex, located at Avda. Martí Pujol 287-301 in Badalona. The project, with a budget of 1.3 million euros, involves the rehabilitation of façades, roofs, and the […]

+ read more

RUBAU AWARDED A HIGHWAY CONCESSIÓN IN MEXICO WORTH OVER 200 MILLION EUROS

This is a major project aimed at designing, building, and operating the highway between Silao and San Miguel de Allende, which also includes the license to reconstruct and later operate the existing highway connecting the towns of Silao and Guanajuato. Rubau, together with the Mexican company VISE, has won the concession for the highway that […]

+ read more
All News