Visita Presidente GRUPO RUBAU_ENG

RUBAU GROUP PRESIDENT VISITS WORKS FOR MEXICO CITY–TOLUCA INTERCITY RAILWAY

March, 2017

On 16 March Rubau Group president Joan Rubau visited the workshops and sheds of the Mexico City–Toluca Intercity Railway. Accompanying him were, Julio Pérez (Mexico Regional Manager), Julián García (Manager of Rubau México), Carlos Javier Gil (Director of Production) and José Manuel Valle (Manager of the Consortium). They took a tour of the site to see how work is progressing.

The contract for the works, worth over 45 million euros, was awarded to the Rubau Group, in a joint venture with the companies Ciacsa, MM-Mex, Sampol and Grupo Electro Costa, in March 2016.

The works include the construction of workshops and sheds, an administrative block and ancillary buildings, along with the permanent installations, the fixtures of each workshop and development of the works, on a plot covering approximately 22 hectares in the city of Toluca, as shown in the image:

Trains enter the facility via an extension of the viaduct from Zinacantepec terminal that crosses the south-bound carriageway in a westerly direction, and continues for roughly 600 meters to the workshop and sheds area.

The works are part of the Mexico City–Toluca Intercity Railway project undertaken by the Mexican Ministry of Communications and Transport (SCT). Measuring 57.7 kilometers, the railway will transport 230 thousand passengers a day on a journey lasting around 39 minutes.

Rubau Group’s experience in projects of this type, along with its well-consolidated presence in the country, have made it worthy of significant involvement in this railway project, which is a major investment in infrastructure by the Mexican government.

Watch the video for more information on this project.

News

RUBAU COMPLETES INFRASTRUCTURE WORKS AT THE LA LLAGOSTA INTERMODAL TERMINAL (BARCELONA)

Rubau has completed the construction works for the infrastructure and equipment required for the operation of the La Llagosta Multimodal Platform in Barcelona. The project provides the terminal with new access points, operational areas, and control, security and telecommunications systems. The works included the reorganisation and improvement of access to the terminal, the installation of […]

+ read more

RUBAU COMPLETES THE URBAN INTEGRATION WORKS ON THE N-502A IN TALAVERA DE LA REINA

Rubau has completed the urban integration works on the N-502A road as it passes through Talavera de la Reina (Toledo), a project promoted by the Ministry of Transport and Sustainable Mobility that has transformed 4.5 kilometres of the former road through the town and improved its integration into the urban environment. The project, with an […]

+ read more

RUBAU AWARDED A RAILWAY CONTRACT IN MEXICO WORTH MORE THAN €170 MILLION

The project includes the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, a strategic infrastructure project aimed at enhancing rail mobility in northern Mexico. Rubau has been awarded the contract for the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, one of the flagship projects […]

+ read more

AREMA COMPLETES WATER SUPPLY REINFORCEMENT WORKS IN PERALADA (GIRONA)

La actuación, promovida por la Agència Catalana de l’Aigua (ACA), mejora la garantía de suministro de las tres redes de distribución que dependen de los pozos del entorno de Peralada. The project, promoted by the Catalan Water Agency (ACA), strengthens the reliability of the three water distribution networks supplied by the wells located around Peralada. […]

+ read more
All News