Mercats de Barcelona entrusts Rubau with the remodelling of the historic MercatdelNinot

December, 2015

ConstruccionesRubau, in a temporary joint venture with VIAS and CALAF, has been awarded the third and final phase of the remodelling of the MercatdelNinot.

La duración de las obras es de 24 meses y se prevé que estén acabadas durante el primer trimestre del año 2015. Con ello se finalizará la última fase de la remodelación de este mercado situado en un emplazamiento histórico para el comercio de la ciudad. La historia de este merado nace a finales del siglo xix con un mercado al aire libre que dependía del Ayuntamiento de Les Corts, que por aquel entonces era un municipio independiente.

The main activities to be carried out are:

  • Refurbishment and remodelling of the entire building, including the roof, giving the façade a new look by resurfacing the exterior.
  • Integrating the outer stands into the façade of the building, thus gaining space on the pavement and recovering the two closed patios on the Carrer Mallorca side as public spaces.
  • Creation of a new main entrance on Carrer Mallorca, with a large lobby with access to the market and/or the new shopping level (on the lower-ground floor) via ramps, steps and lifts.
  • Excavation and two-level construction with room for between 80 and 90 parking spaces for market customers, loading and unloading of goods and storage units.
  • The aim of these actions is to promote the dynamic character of the market and the reputation it has had throughout history as an important shopping centre.

News

RUBAU AWARDED A RAILWAY CONTRACT IN MEXICO WORTH MORE THAN €170 MILLION

The project includes the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, a strategic infrastructure project aimed at enhancing rail mobility in northern Mexico. Rubau has been awarded the contract for the design and construction of six stations for the new Saltillo–Nuevo Laredo Passenger Train, one of the flagship projects […]

+ read more

AREMA COMPLETES WATER SUPPLY REINFORCEMENT WORKS IN PERALADA (GIRONA)

La actuación, promovida por la Agència Catalana de l’Aigua (ACA), mejora la garantía de suministro de las tres redes de distribución que dependen de los pozos del entorno de Peralada. The project, promoted by the Catalan Water Agency (ACA), strengthens the reliability of the three water distribution networks supplied by the wells located around Peralada. […]

+ read more

RUBAU COMPLETES THE CONSTRUCTION OF THE MANHATTAN RESIDENTIAL DEVELOPMENT IN ENSANCHE DE VALLECAS (MADRID)

RUBAU has completed the construction of Manhattan Residential, a development of 66 homes located in Ensanche de Vallecas (Madrid), built for the client PREMIER ESPAÑA S.A.U. The project, carried out between June 2024 and January 2026, comprises two-, three- and four-bedroom apartments with storage rooms and parking spaces, integrated into a private residential complex designed […]

+ read more

LLOGUERALIA COMPLETES THE CONSTRUCTION OF 110 AFFORDABLE RENTAL HOMES IN CALAFELL

Llogueralia has completed the construction of 110 affordable rental homes in Calafell, a key project aimed at expanding the supply of accessible housing in the municipality and responding to local residential demand. Located in the Sant Andreu neighbourhood of Calafell and promoted in collaboration with Calafell Town Council, this development has involved an investment of […]

+ read more
All News