arema rubau

AREMA STARTS UP THE NEW TIVENYS TREATMENT PLANT

June, 2023

Yesterday, June 14, the renovation of the Tivenys wastewater treatment plant (EDAR) was put into service, which allows it to meet the current and future sanitation needs of the municipality, in addition to guaranteeing quality treated water in accordance with the provisions of the Directive 91/271/EEC. The mayor of Tivenys, Eladi Galbe; the president of the Baix Ebre County Council, Xavier Faura and the director of the Wastewater Treatment Area of ​​the Catalan Water Agency (ACA), Isabel Gandullo,visited the facilities. 

 

The new Tivenys treatment plant replaces the one that was in service, now having a capacity of 150 m3/day and consists of a purification process through activated sludge with the construction of a biological reactor, a decanter for purified water and a sludge thickener, thus guaranteeing the treatment of the water until the elimination of nutrients, providing the environment with good quality outlet water.

 

In addition, the new treatment plant incorporates a photovoltaic field with a power of 30 Kwp (kilowatt power), so that part of the plant’s energy consumption is generated on site. This installation has been carried out by PRENERGY, the energy services subsidiary of GRUPO RUBAU, a specialist in renewable energy and energy efficiency.

 

As a result of the remodeling carried out by the companies AREMA, RUBAU and PRENERGY, the treatment plant has doubled its wastewater treatment capacity, improving the quality of the environment and clearly improving its energy efficiency, which reflects the clear commitment of RUBAU GROUP for the circular economy and the sustainable development objectives of the 2030 Agenda.

News

TRANSPORT AWARDS RUBAU THE AMBITIOUS HUMANIZATION PLAN FOR THE OLD N-502 IN TALAVERA DE LA REINA

The Ministry of Transport and Sustainable Mobility has awarded Grupo RUBAU the project for the improvement of the N502a as it passes through Talavera de la Reina (Toledo) to adapt it for pedestrian and cyclist traffic. The works focus on improving 4.56 km of urban road, and the tasks include resurfacing and generally conditioning these […]

+ read more

RUBAU TO RENOVATE THE LARGEST WATER TREATMENT PLANT IN CATALONIA

The Ens d’Abastament d’Aigua Ter-Llobregat (ATL) has awarded a 102 million euro contract for the rehabilitation works of the Ter plant project (ETAP Ter) to the consortium UTE RUBAU – AREMA – FERROVIAL – CADAGUA. The actions include the rehabilitation of the existing sand filters, the construction of a new reservoir and a pumping station, […]

+ read more

RUBAU TO BUILD 135 HOMES FOR INBISA IN CASTELLAR DEL VALLÉS

This is an exclusive development with an A energy rating, featuring a swimming pool, children’s play areas, and pre-installation for electric vehicle charging. RUBAU will build the Residencial Inbisa Castellar, a residential complex of 135 homes, garages, and storage rooms in Castellar del Vallés. The development, located on Ronda Tolosa in this Vallés town, includes […]

+ read more

RUBAU WILL REDUCE NOISE POLLUTION IN THE NORTHWEST ARC OF MURCIA

The Ministry of Transport and Sustainable Mobility has awarded the RUBAU – TECOPSA joint venture the contract for implementing corrective measures regarding noise pollution in sections B and C of the Northwest Arc Highway in Murcia. These are complementary actions involving an investment of over €2.8M to reduce noise pollution in these sections, which cover […]

+ read more
All News