Rubau Aridcal Rubau Aridcal

ARIDCAL AND RUBAU PARTICIPATE IN THE CREATION OF THE NEW MUSEUM PROJECT OF THE UdG: EL JARDÍ DE LES ROQUES

May, 2021

Today, May 28, the new open-air museum project of the University of Girona (UdG) was inaugurated on the Montilivi Campus: El Jardí de les Roques. The event was attended by the Rector of the University and the Dean of the Faculty of Science.

It is a permanent informative installation of Earth Sciences that is configured as an open-air museum where the different rocks can be observed as monuments and samples of the geological heritage of the Girona region.

The project, an initiative of the GEOCAMB center and the Faculty of Sciences, has been financed by the UdG, and it has been possible thanks to the collaboration of companies such as ARIDCAL and RUBAU that have donated their rock samples for free and without interest.

For more information we invite you to visit the link:

The Jardí de les Roques

News

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE RENOVATION OF THE WWPS AND EXTENSION OF THE WWTP IN ROSES

Last July, the Consorci de la Costa Brava awarded the AREMA – RUBAU joint venture the contract for the renovation of the central pumping station (WWPS) and the extension of the pre-treatment of the wastewater treatment plant (WWTP) in Roses.   The purpose of the contract is to modify the central WWPS by getting rid of […]

+ read more

RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network. It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective […]

+ read more

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR

Last June, Ens d’Abastament d’Aigües Ter-Llobregat (ATL) awarded the AREMA – RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.  The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that […]

+ read more
La Roca Village. RUBAU

RUBAU COMPLETES THE CONSTRUCTION OF THE UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”

RUBAU has completed the construction of the new UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”, a sustainable and environmentally friendly project during its design and construction.  La Roca Village is the largest outlet-style shopping destination in southern Europe and it is located in La Roca del Vallès. With the aim of improving […]

+ read more
All News