RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

July, 2021

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network.

It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective of which is to improve the autonomy of people with disabilities and special needs. RUBAU previously carried out accessibility works at Príncipe Pío station and Plaza Castilla station, among others. 

The Metro Madrid Accessibility Plan covers a series of actions aimed at improving the accessibility of its facilities, with the aim that all people can travel under equal conditions. 

The measures to be implemented by RUBAU in the stations include the installation of step-free access, including lifts, escalators and/or ramps; platform edge signage with tactile floor paving; the signalling of the safety zone on platforms and the area around ticket machines with tactile paving; the extension of handrails on fixed stairs and the reinforcement of vertical signage; the adaptation of the lighting system in entrances; the installation of voice-prompted menus and braille text marking; and the elimination of obstacles and danger points.

With its participation in the Metro Madrid Accessibility Plan, RUBAU will contribute to create a network that is part of the daily life of all Madrilenians safer, more comfortable, and more equal.

News

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE RENOVATION OF THE WWPS AND EXTENSION OF THE WWTP IN ROSES

Last July, the Consorci de la Costa Brava awarded the AREMA – RUBAU joint venture the contract for the renovation of the central pumping station (WWPS) and the extension of the pre-treatment of the wastewater treatment plant (WWTP) in Roses.   The purpose of the contract is to modify the central WWPS by getting rid of […]

+ read more

RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network. It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective […]

+ read more

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR

Last June, Ens d’Abastament d’Aigües Ter-Llobregat (ATL) awarded the AREMA – RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.  The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that […]

+ read more
La Roca Village. RUBAU

RUBAU COMPLETES THE CONSTRUCTION OF THE UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”

RUBAU has completed the construction of the new UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”, a sustainable and environmentally friendly project during its design and construction.  La Roca Village is the largest outlet-style shopping destination in southern Europe and it is located in La Roca del Vallès. With the aim of improving […]

+ read more
All News