The drought affecting Catalonia poses significant challenges for industries and communities, requiring a responsible and sustainable approach to water resource management. At Aridcal S.A., as a mining company dedicated to the production of aggregates for construction, we are fully aware of our responsibility in this context and have adopted concrete measures to minimize water consumption in our operations while ensuring environmental protection.
Water Use in Our Operations
Water is an essential resource in our activities, primarily used in three key areas:
Authorized Water Concession and Actual Consumption
Aridcal has an authorized water concession of 27,600 m³ per year, a volume that allows us to operate efficiently and sustainably. However, aware of the importance of reducing our environmental impact, we have worked intensively to decrease our actual water consumption, achieving remarkable results in recent years:
These figures reflect our commitment to optimizing water use and our ability to adapt to sustainability demands.
Implemented Water-Saving Measures
The notable reduction in our water consumption is not by chance but the result of continuous efforts to implement more efficient practices. Among the measures adopted, the following stand out:
Commitment to the Environment
At Aridcal S.A., we understand that efficient water management is key to mitigating the environmental impact of our activities and contributing to the well-being of the communities in which we operate. Our goal is to continue advancing in this direction, demonstrating that it is possible to combine industrial productivity with respect for the natural environment.
In the current drought context, we reaffirm our commitment to sustainability and the pursuit of innovative solutions to ensure responsible water use, not just as an operational necessity but as an ethical obligation to the environment and future generations.
News
Rubau has completed the construction works of the Célere Acacia development, a residential complex comprising 102 homes located in Dos Hermanas (Seville), developed for Vía Célere. The project involved the construction of a residential building offering 2, 3 and 4-bedroom homes, as well as parking spaces and storage units, resulting in a modern and functional […]
AREMA (Rubau Group) has completed the refurbishment works of the Sant Gregori Wastewater Treatment Plant (WWTP), a project promoted by the Catalan Water Agency that represents a significant improvement in the capacity and efficiency of water treatment in the municipality. The new facility responds to the growth experienced in recent years, increasing its capacity from an […]
Rubau, in a joint venture with Grulop 21, has signed the contract for the construction of the new Biosanitary Campus of the University of Castilla-La Mancha (UCLM) in Ciudad Real, a strategic project in the academic and healthcare sector with an investment of over €38 million and a 30-month execution period. The future complex will […]
Rubau México has been awarded the contract for the construction of the Maravatío Bypass in the State of Michoacán, for a total amount of 785.2 million Mexican pesos (€38.5 million), VAT included. The project, promoted by Red de Carreteras de Occidente (Abertis Group), will be carried out in the municipality of Maravatío and has an […]