RUBAU AV CIUDAD DE CALI RUBAU AV CIUDAD DE CALI

INAUGURATION OF CIUDAD DE CALI AVENUE, CALI’S MAJOR ENGINEERING WORK IN THE LAST YEARS

November, 2018

Last Tuesday, October 30, Mayor Maurice Armitage inaugurated the extension of Avenida Ciudad de Cali between Carrera 50 and Carrera 80. The project has been carried out by a business consortium of which RUBAU is the principle member.

The project has consisted of the building of two road bridges, one over the Canal Interceptor Sur and the other over the Meléndez River; connecting bridges for cyclists; and a road with a total length of 1,100 metres and a width of 60 metres between the planned bridges, connecting the roads Carrera 49 and Carrera 81a.

According to Marcial Quiñones, Secretary of Infrastructure of the city, it is the major civil engineering work carried out in Cali in recent years. The project has provided a link to the south-eastern part of the city. The districts of El Caney, Ciudad Córdoba and Valle del Lili stand to gain the most, as they formerly had only one road to the area

This project, part of the Megaobras Plan approved by the City Council, which aims to provide Cali with modern and efficient infrastructures, have made Rubau part of the city’s development and growth.

We attach drone video of the result of the construction works.

News

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE RENOVATION OF THE WWPS AND EXTENSION OF THE WWTP IN ROSES

Last July, the Consorci de la Costa Brava awarded the AREMA – RUBAU joint venture the contract for the renovation of the central pumping station (WWPS) and the extension of the pre-treatment of the wastewater treatment plant (WWTP) in Roses.   The purpose of the contract is to modify the central WWPS by getting rid of […]

+ read more

RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network. It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective […]

+ read more

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR

Last June, Ens d’Abastament d’Aigües Ter-Llobregat (ATL) awarded the AREMA – RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.  The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that […]

+ read more
La Roca Village. RUBAU

RUBAU COMPLETES THE CONSTRUCTION OF THE UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”

RUBAU has completed the construction of the new UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”, a sustainable and environmentally friendly project during its design and construction.  La Roca Village is the largest outlet-style shopping destination in southern Europe and it is located in La Roca del Vallès. With the aim of improving […]

+ read more
All News