Rubau - urbanización barrio de la Marina ZF Rubau – urbanización barrio de la Marina ZF

BAGURSA SELECTS RUBAU TO UNDERTAKE DEVELOPMENT OF LA MARINA DISTRICT, ZONA FRANCA (BARCELONA)

December, 2016

BAGURSA, Barcelona’s municipal urban management company, has awarded RUBAU the development contract under the special infrastructures plan for the La Marina district of the Zona Franca, in Barcelona.

The works, with a budget of over 4 million euros, include the development of Calle Ascó (between Calle Arnés and Calle Motors), Calle Ciscó (between Calle de l’Acer and Calle Ascó), Calle Motors (between Calle de la Metal.lurgia and Calle Ascó) and works outside the development area at the corner of Calle Motors and Paseo de la Zona Franca. The aim is to link developed areas in Calle Motors and Calle Ulldecona and provide service links to the district’s future Parque Central.

The current developed area will be extended with new services: street lighting, sewers, water, sprinklers, gas and telecommunications. Noteworthy is a sustainable drainage system in which rainwater from pavements and roofs is conveyed to flower beds where it is stored and filtered into the ground. The project also includes civil works for a central hot and cold water system, which will provide the district with the latest smart city technology.

The works awarded to RUBAU are part of an urban renewal project that is being carried out in La Marina del Prat Vermell, one of the districts with the greatest potential in Barcelona.

News

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE RENOVATION OF THE WWPS AND EXTENSION OF THE WWTP IN ROSES

Last July, the Consorci de la Costa Brava awarded the AREMA – RUBAU joint venture the contract for the renovation of the central pumping station (WWPS) and the extension of the pre-treatment of the wastewater treatment plant (WWTP) in Roses.   The purpose of the contract is to modify the central WWPS by getting rid of […]

+ read more

RUBAU STRENGTHENS ITS POSITION AS A LEADING PROVIDER IN ACCESSIBILITY WORKS FOR THE MADRID METRO STATIONS

RUBAU has been awarded contracts for the execution of implementation works and improvement of accessibility measures to Colonia Jardín station (L10 and ML2 and ML3) and Pinar de Chamartín station (L1 and L4) on the Metro Madrid network. It is not the first time that Metro Madrid has entrusted such work to RUBAU, the objective […]

+ read more

AREMA AND RUBAU ARE AWARDED THE CONTRACT FOR THE NEW CORBERA RESERVOIR

Last June, Ens d’Abastament d’Aigües Ter-Llobregat (ATL) awarded the AREMA – RUBAU joint venture the contract for the execution of the works to upgrade the Corbera PC 15.7 reservoir.  The contract is for the construction of a new 4,000 m3 regulation reservoir, located on a plot next to the existing reservoir on the road that […]

+ read more
La Roca Village. RUBAU

RUBAU COMPLETES THE CONSTRUCTION OF THE UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”

RUBAU has completed the construction of the new UNDERGROUND CAR PARK AND THE REMODELLING OF “LA ROCA VILLAGE”, a sustainable and environmentally friendly project during its design and construction.  La Roca Village is the largest outlet-style shopping destination in southern Europe and it is located in La Roca del Vallès. With the aim of improving […]

+ read more
All News